北京市北小河再生水厂MBR工艺介绍
作者:杨岸明12,甘一萍2,常江2,艾冰2,彭永臻
单位: 1.北京工业大学北京市水质科学和水环境恢复工程重点实验室,北京 100124;2.北京城市排水集团有限责任公司, 北京 100063)
关键词: 北小河再生水厂;MBR;再生水
出版年,卷(期):页码: 2011,31(4):95-99

摘要:
北小河再生水厂是在原北小河污水处理厂基础上改扩建而成的,采用膜生物反应器(MBR)工艺,处理规模为6万m3/d,是目前国内市政污水处理中最大规模的MBR工程。工程于2008年4月试运行,7月正式运行,水厂运行稳定,出水水质优良,出水满足《城市污水再生利用城市杂用水水质》(GB/T 18920-2002)中“车辆冲洗”水质标准。介绍了工程的主要设计参数、膜系统的清洗方式及运行工况,并分析了MBR对主要污染物去除效果。
Beixiaohe Reclaimed Water Plant which is the largest scale MBR plant in China was rebuild from the old Beixiaohe WWTP. The treatment capacity of the plant is 60,000 m3/d.The plant was started the trial operation on April , 2008 and put into use on July,2008.Stable operation and excellent quality effluent was achieved in the almost 2 years operation. The high-quality reclaimed water complies with the water quality requirements for car washing purpose specified in “Water Quality Standard for Urban Miscellaneous Water Consumption” [GB/T 18920-2002].The main design parameter and operation condition were introduced and the treatment effect was analyzed.
杨岸明(1975 - ) ,男,内蒙古乌蒙人,博士研究生,工程师,研究方向为污水生物处理技术。E - ma il: anmyang@sina.com,*通讯联系人,E-mail:pyz@bjut.edu.cn,电话:13164226326

参考文献:
[1]李  艺,李振川.北京北小河污水处理厂改扩建及再生水利用工程介绍[J].给水排水,2010,36(1):27-31.
[2]沈维勇.MBR工艺在北小河污水处理厂改扩建工程中的应用[J].市政技术,2010,28(2):114-116.
[3]Wu Guiping,Cui Longzhe,Xu Youyi.A novel submerged rotating membrane bioreactor and reversible membrane fouling control[J].Desalination,2008,228:255–262.
[4]Simon Judd,Claire Judd.The MBR Book:Principles and applications of membrane bioreactors in water and wastewater treatment[M].2007.
[5] 李林宝,文一波,侯巧玲,等.低温生物脱氮法处理污水的研究进展[J].中国资源综合利用,2007,25(5):26-29.
[6]Mauret M, Paul E, Peutch-Costes E, et al.Application of experimental research methodology to the study of nitrification in mixed culture.Water Sci Technol,1996,34(1- 2):245-252.
 

服务与反馈:
文章下载】【加入收藏

《膜科学与技术》编辑部 地址:北京市朝阳区北三环东路19号蓝星大厦 邮政编码:100029 电话:010-64426130/64433466 传真:010-80485372邮箱:mkxyjs@163.com

京公网安备11011302000819号